哈芬公园
Hafenpark
西奈半岛:哈芬公园的公开开放完成了从工业废弃地到新公共公园的转变过程。根据2009年对法兰克福人口的在线调查,制定了公共领域竞赛简介,西奈提交了获奖作品。公园的第一部分将于2012年12月建成,即“混凝土丛林”溜冰场和BMX跑道。运动和娱乐“丝带”横跨公园的中段,有篮球场、多用途运动场、攀岩公园和健身设备,2013年夏天,滑板手和BMX自行车手将新公园作为自己的公园——最近,快速发展的Freeletics社区加入了进来。
SINAI: The public opening of the Hafenpark completes the process of transformation from industrial wasteland site to new public park. Based on an online survey of Frankfurt’s population in 2009, the brief for a public realm competition was developed, to which SINAI submitted the winning entry. The first part of the park to be completed was the “Concrete Jungle” skate and BMX track, opened in December 2012. The sports and play “ribbon” across the park’s middle section, with basketball pitches, multi-purpose playing fields, a climbing park and fitness equipment, followed in summer 2013. Skateboarders and BMX bikers have since adopted the new park as their own – recently joined by the fast-growing Freeletics community.
© Philip Winkelmeier
© Philip Winkelmeier
© Philip Winkelmeier
© Philip Winkelmeier
© Philip Winkelmeier
© Philip Winkelmeier
© Philip Winkelmeier
© Philip Winkelmeier
© SINAI
© SINAI
随着公园临河一侧的新草地面积的增加,那些寻求更放松环境的人现在也得到了满足。这最后一个待完成的部分提供了在阴凉的小树林和野花草地之间的高地上安静的休养。哈芬公园现在从EZB塔引人注目的背景一直延伸到新的Honsell桥,从而标志着河流长廊和法兰克福绿带向北的终点。公园的总体布局以Honsell Bridge和法兰克福天际线之间的视觉轴为线索,这一点在沿着运动和娱乐小道的突出钢格架上得到了体现。广阔的南北视野打开了北面“混凝土丛林”和南面主河道之间的连接。充满活力的活动和宁静的空间、有趣的运动和对自然的宁静沉思在大气中并置,体现了21世纪的公共公园——法兰克福市就是如此。
With the new meadow areas on the river-facing side of the park, those seeking a more relaxing setting are now also catered for. This last section to be completed offers quiet retreats on raised plateaus among shady groves and wildflower meadows. The Hafenpark now stretches from the striking backdrop of the EZB tower all the way to the new Honsell Bridge, thus marking the end point of both the river promenade and Frankfurt’s green belt towards the north. The park’s overall layout takes its cues from the visual axis between Honsell Bridge and Frankfurt’s skyline, and this is articulated in the prominent steel trellis features along the sports and play trail. A broad north-south vista opens up the connection between the “Concrete Jungle” to the north and the river Main to the south. The atmospheric juxtaposition of vibrant activity and calm spaces, fun sports and the quiet contemplation of nature, embodies – so the verdict of the city of Frankfurt – the public park of the 21st century.
Data
混凝土丛林顾问:朱尔根·霍沃思
Landscape Architecture: SINAI GESELLSCHAFT VON LANDSCHAFTSARCHITEKTEN MBH
Year: 2015
Client: city of Frankfurt, parks department
Procedure: restricted design competition / with open application procedure, 2010, 1st prize
Construction: 2010-2014
Building costs: 5,2 Mio. €
Area: 4,0 ha
Pproject partners
construction management: Götte Landschaftsarchitekten, Frankfurt am Main,
expert planners: Ingenieurbüro für Bauwesen Wetzel & von Seth, Berlin Wasser Ingenieurbüro Obermeyer, Potsdam
advisor concrete jungle: Jürgen Horwarth