北胜中学
Hokksund Middle School
Østengen&;Bergo Landskapparkitekter:场地有限,地势平坦,周围景观无特殊景观。然而,该遗址被一排高大、美丽的菩提树包围着,东面朝向Rådhusgate,南面则是美丽的山楂树。在西部,该场地与填埋场上的铁路接壤,距离校园3米。
Østengen & Bergo landskapsarkitekter: The site is limited, flat terrain with no particular sight to the surrounding landscape. However, the site is surrounded by a row of large, beautiful linden trees towards Rådhusgate in east, and nice hawthorns in south. In west, the site borders to a railway on a landfilling, 3 m above the schoolyard.
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
© Østengen & Bergo
Concept
–北部的交通区域
The building is placed towards north-east to achieve the best possible outdoor area oriented towards south-west. The site is divided into three parts from south to north:
– The green part in south with activities and playing areas in a park like atmosphere
– The court with a central “carpet” from the bus stop/ drop-off, towards the main entrance and throughout the building.
– Traffic area in north
Part of the roof top is made available as an outdoor area with two amphitheaters for outdoor teaching.
Bike parking and traffic.
车辆和行人交通是分开的。现有公交车站将移至现场北部。汽车停放在外部场地。HC停车场靠近主入口和体育馆入口。沿建筑物北侧布置垃圾输送和收集。有两个主要的自行车停放区,一个靠近主入口,另一个靠近体育馆,有足够的空间停放250辆自行车。
Vehicular and pedestrian traffic is separated. Existing bus stop is moved to the north of the site. Parking for cars is at an external site. HC parking is next to the main entrance and the entrance to the gymnasium. Delivery and garbage pick-up is arranged along the north-side of the building. There are two main areas for bike parking, one close to the main entrance, and the other one next to the gymnasium, with enough space for 250 bikes.
Physical education, sport and play
该设计强调为具有不同需求和技能的儿童和青少年在课余时间创造有吸引力、多样化和激动人心的活动。在正门旁边,一座攀岩雕塑欢迎学生。由于密集的使用,绿色部分被人造草地覆盖,有休闲空间,封闭区域用于打球、滑冰/自行车公园、沙滩排球以及力量和平衡挑战。沿着垃圾棚的立面被用作一堵抱石墙,面对着一个放置街头篮子和乒乓球桌的区域。
The design emphasizes on creating attractive, varied and exciting activities for children and youth with different needs and skills, both during and after school hours. Next to the main entrance, a climbing sculpture welcomes students. The green part is covered by artificial grass due to the intensive use, with spaces for relaxation, enclosed area for ball play, skating/biking park, sand volleyball and strength and balancing challenges. The façade along the garbage shed is used as a bouldering wall, facing an area for street basket and a ping-pong table.
Rest, quiet zones, learning
校园中央有一个鲜橙色橡胶沥青座椅结构。由于其拉长的形状和布局,该建筑既是一个室外教室,也是校园绿色部分活动的论坛。用户可以选择是坐下、躺下、观看、学习还是简单地吃午餐。部分室外区域由屋顶覆盖,适合放置家具。学习集成在摊铺机中,摊铺机具有太阳系、化学公式和选定元素结构的特征。
A seating construction in bright orange rubber asphalt is centrally located in the schoolyard. With its elongated shape and placement, the construction functions both as an outdoor classroom and as a tribune for activities on the green part of the schoolyard. Users are able to choose whether to sit, lie down, be a spectator, learn or simply eat lunch. Part of the outdoor area is covered by a roof and is suited for furniture. Learning is integrated in the pavers who have been characterized with the solar system, chemical formulas and the structure of selected elements.
Materials
Large concrete pavers cover the court. The outdoor classroom is in bright orange rubber asphalt. The entire park area in south is covered by artificial grass to get a calm and continuous surface. Asphalt is used for the driveways and pedestrian walkways.
Vegetation
The existing, large trees on site are preserved. Blossoming, sterile cherry trees are planted together with the orange seating element. The bike parking in north-west is under a grove of red oak. South of the field, sargent crabapple is planted in extension of the existing row of hawthorn.
Accessibility
The outdoor area is adapted to the requirements of accessibility for everyone, and all activities are available for the disabled. An elevator provides access to the rooftop. Walkways do not exceed an incline of 1:20. From the bus stop to the main entrance there is a visual guiding line.
data
照片来源:所有照片均由stengen&;贝戈兰德斯卡帕西特酒店
Location: Hokksund, Norway
Client: Øvre Eiker municipality
Competition: 2009, 1st prize
Realisation: 2011-12
Area: 7500 m2
Landscape architect: Østengen & Bergo landskapsarkitekter, Oslo
Architect: L2 Architects
Photo credits: All photos are by Østengen & Bergo landskapsarkitekter