Bishan Park

图库/公园广场/2018-6-26 18:08 349 0 收藏

Bishan Park

Ramboll Studio Dreiseitl: Bishan Park is one of Singapore’s most popular parks in the heartlands of Singapore. As part of a much-needed park upgrade and plans to improve the capacity of the Kallang River along the edge of the park, works were carried out simultaneously to transform the utilitarian concrete channel into a naturalised river, creating a new urban river park.

©

德莱塞特尔
Dreiseitl

©

Dreiseitl

©

德莱塞特尔
Dreiseitl

©

Dreiseitl

©

Dreiseitl

©

Dreiseitl

©

德莱塞特尔
Dreiseitl

©

德莱塞特尔
Dreiseitl

©

德莱塞特尔
Dreiseitl

©

德莱塞特尔
Dreiseitl

©

德莱塞特尔
Dreiseitl

©

Dreiseitl

目前,世界上38%的人口遭遇水资源短缺。正如最新的联合国统计数据显示,世界上60%的城市将面临2025的水资源短缺,讽刺的是,全球许多城市都同时经历了洪水的破坏。凯朗河-璧山公园项目是蓝水城市基础设施的新愿景,解决了城市供水和洪水管理的双重需要,同时为城市中的人和自然创造了空间。这个项目是积极、美丽、干净的水域(ABC WATE)项目的一部分,这是一项长期的计划,将该国的水体转变为排水和供水功能,成为充满活力的、新的社区纽带和娱乐场所。
Currently, 38% of the world’s population experience water scarcity. As the latest UN statistics state that 60% of the world’s city will face water shortage by 2025, ironically many cities across the globe experience in parallel the devastation of flooding. The Kallang River- Bishan Park project is a new vision for blue-green city infrastructure which addresses the dual needs of water supply and flood management while creating spaces for people and nature in the city. This project is part of the Active, Beautiful, Clean Waters (ABC Waters) Programme, a long-term initiative to transform the country’s water bodies beyond their functions of drainage and water supply, into vibrant, new spaces for community bonding and recreation.

在璧山和安基公园,一条2.7公里长的混凝土直排渠道已经恢复成蜿蜒的天然河流3公里长,蜿蜒穿过公园。六十二公顷的公园空间已重新设计,以适应河流系统的动态过程,其中包括波动的水位,同时为公园用户提供最大的利益。三个游乐场,餐厅,一个新的外观点使用旧的混凝土渠道再生墙,以及大量开放的绿地补充了城市中心的生态修复河流的自然奇迹。这是一个去掉鞋子,靠近水和大自然的地方!
At Bishan-Ang Mo Kio Park, a 2.7 km long straight concrete drainage channel has been restored into a sinuous, natural river 3 km long, that meanders through the park. Sixty-two hectares of park space have been redesigned to accommodate the dynamic process of a river system which includes fluctuating water levels, while providing maximum benefit for park users. Three playgrounds, restaurants, a new look out point constructed using the recycled walls of the old concrete channel, and plenty of open green spaces complement the natural wonder of an ecologically restored river in the heart of the city. This is a place to take your shoes off, and get closer to water and nature!

Landscape Architecture: Ramboll Studio Dreiseitl

Partners in Charge: Herbert Dreiseitl, Gerhard Hauber

项目管理与领导设计:Tobias Baur、Rudolf Mager、Leonard Ng、Hendrik Porst
Project Management and Lead Design: Tobias Baur, Rudolf Mager, Leonard Ng, Hendrik Porst

Project Engineers: Andreas Bockmühl,

斯特凡·布鲁克曼
Stefan Brückmann

项目团队:Jeff Boggess、Angelika B·切勒、Jason Chia、伊迪丝、Gustavo Glaeser、Tobias Klinger、Martin Koller、Tube uHrBrand、Wi-Min、
Project Team: Jeff Boggess, Angelika Büchele, Jason Chia, Edith, Gustavo Glaeser, Tobias Klinger, Martin Koller, Birgit Kühlbrandt, Wi Ming, Herbert Montevirgen,

Vera Sieber, Angela Soler, Chanida Suebpanich,

Sebastian Walker,Melissa Yip,Ingo Zoefelt,Christoph Hald,能世正
Sebastian Walker, Melissa Yip, Ingo Zoefelt, Christoph Hald, Nengshi Zheng

生物工程:彼得盖茨与合作伙伴
Bioengineering: Peter Geitz und Partner

合资伙伴:
JV Partner:

CH2MHILL

项目业主:新加坡国家水利局和国家公园委员会
Project owners: PUB, Singapore’s national water agency and the National Parks Board

Image credits: Ramboll Studio Dreiseitl, PUB, Wang

Text: Ramboll Studio Dreiseitl

Awards: WAF 2012, Excellence on the Waterfront Honor Award 2012, President’s Design Award Singapore 2012

卡朗河璧山公园项目实情:
Kallang River-Bishan Park Project Facts:

正式开幕:2012年3月17日新加坡总理
Official opening: 17 March 2012 by the Prime Minister of Singapore

面积:52公顷(再开发前),目前62公顷
Area: 52 hectares (before redevelopment), currently 62 hectares

年度签证:> 300万
Annual visitorship: > 3 million

Length of concrete channel before redevelopment: 2.7 km

科朗河入海段长度:3公里
Length of naturalised section of Kallang River: 3 km

Total length Kallang River: 10 km

Timeline design: 2007-2010

时间线建设:
Timeline construction:

2009年10月至2012年2月(2年)
October 2009 to February 2012 (2 ½ years)

建筑成本:7600万新元/ 4500万欧元/ 6000万美元
Construction costs: 76 million SGD / 45 million € / US$ 60 million

暂无评论,快来抢沙发!

园林吧内容由用户发布,版权归原作者所有,未经允许不得转载。若有内容侵犯到您的权益,请联系我们删除。

返回顶部